
• Execution and treatment of structural expansion joints across walls, ceilings, and floors to prevent water leakage between levels.
• Installation of PVC joint systems bonded with epoxy for watertight performance.
• Application of sealants to ensure flexible and durable joint protection.
Works were executed while multiple activities and trades were ongoing simultaneously at site. This created high risk of damaging freshly applied joint systems.
The team implemented strict coordination and protection measures, isolating joint works and sequencing activities to safeguard quality. Despite the complex site environment, all joints were installed and handed over successfully.