Do You Have Any Inquiries?
• Execution of epoxy protective flooring systems across multiple milling facilities.
• Surface preparation including heavy grinding and removal of contaminants.
• Treatment of terrazzo flooring areas for bonding strength.
• Removal of vinyl tiles and adhesive residues in designated zones before epoxy application.
• Application of complete epoxy system for long-term protection against abrasion and chemical exposure.

1. The factories had different existing surfaces:
2. Acid-resistant tiles floors requiring intensive surface grinding.
3. Vinyl tiles with adhesive layers that had to be removed completely.
4. Cement-based terrazzo tiles that required surface treatment before coating.
Specialized preparation methods were applied for each condition: grinding terrazzo, removing vinyl tiles and adhesives, and strong surface treatment to ensure proper bonding. After preparation, the epoxy flooring system was successfully installed across all facilities.







