
• Removal of previously applied but defective waterproofing system.
• Full surface preparation and repair of substrate.
• Application of cementitious repair materials for honeycombs and cracks.
• Application of flexible cementitious waterproofing system across all pool surfaces.

The swimming pool had already been waterproofed by another contractor, but leakage and defects appeared. The project also had a very tight timeline as the pool needed to be operational quickly.
The old system was removed, repairs were carried out with Master Builders Solutions materials, and a new flexible waterproofing system was installed. The pool was successfully completed and handed over on time, ready for use.





