• Preparation of existing concrete floors using shot blasting machines.
• Application of epoxy primer for surface bonding.
• Application of epoxy putty for surface levelling and repair.
• Final application of epoxy self-leveling system across the full production hall.
• Expansion joint treatment with specialized sealant.

The factory shutdown period for maintenance was only 12 days, and the entire flooring works had to be completed within this tight schedule.
Detailed planning, efficient machinery, and use of fast-curing epoxy systems enabled successful completion and handover within the allocated shutdown period in coordination with the factory management.