• Full waterproofing system applied for bathrooms and kitchens in multiple zones.
• Surface preparation and repair using cementitious grout.
• Multi-layer waterproofing with MasterSeal 599, reinforced with fiberglass mesh between coats.
• Additional leveling works with foam concrete topping to adjust levels.
• Final protection layers applied before concrete screed and finishing works.
• Expansion joint sealing with MasterTile 705 to ensure watertight performance.

The project was on a very tight schedule due to the mall’s planned grand opening. In addition, this system was difficult in coordination.
The team coordinated with the project management to ensure fast-track execution, applying the international waterproofing system with full compliance. Despite the challenging deadline, works were completed successfully and delivered before opening.